Move both locking bars out to each side.
Centre the cover over and above the base and move the cover down at a shallow angle until
the 'v' groove at the cover locates on the top mounting stud
All conduit adapters must be firmly seated to ensure that cover closes.
When the cover is firmly seated, slide the locking bars inward to secure the cover. Pull up on
each bottom corner to ensure that the locking bars are seated properly.
When the cover locking bars are pushed in, the utility seal holes should be in alignment
allowing for a Service Utility seal wire to be installed as shown.
Record the Meter Map
If an Installation Record was not provided with the metering equipment to direct the
installation the final step in the installation process is to complete the Installation Record to
record the mapping of the circuits being measured to the meter points. A copy of Figure 23,
which is organized to resemble a breaker panel, is provided with each Triacta GATEWAY,
and is to be completed and delivered to your system administrator.