Boiler Piping
Fig. 11: System Piping - Multiple Zone Valve with Single System/Boiler Circulator
Fig. 12: System Piping - Single Zone System with Single System/Boiler Circulator
Note: Verify CH circulator is
properly sized to overcome the
system pressure drop and pro-
vide adequate flow through the
boiler system.
Note: Verify CH circula-
tor is properly sized to
overcome the system pres-
sure drop and provide ade-
quate flow through the
boiler system.
The boiler system piping shown must be a “closed” system to avoid any
oxygen contamination and potential failure of the outer tank of the Smart.
NOTICE
Note: Reference Fig. 25, page 39 for
Prestige Wiring.
Note: Reference Fig. 26, page 39 for
Prestige Wiring.

Table of Contents

Other manuals for TriangleTube PSRKIT25

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the TriangleTube PSRKIT25 and is the answer not in the manual?

TriangleTube PSRKIT25 Specifications

General IconGeneral
BrandTriangleTube
ModelPSRKIT25
CategoryBoiler
LanguageEnglish

Related product manuals