Tuthill PD Plus - Start-Up Checklist

Tuthill PD Plus
70 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Manual 2007 Rev B p/n 2007
24
06
Operation
Carry out initial operation under “no load”
conditions by opening all valves and venting
the discharge to atmosphere, if possible. Then,
start motor brie y, listen for unusual noises, and
make sure the blower coasts freely to a stop. If
no problem appears, repeat this check and let the
motor run slightly longer. If any questions exist,
investigate before proceeding.
Assuming all tests are satisfactory, the blower will
now be ready for continuous full-load operation.
During the rst several days, check periodically to
make sure all conditions remain acceptable and
steady. These checks may be particularly important
if the blower is part of a process system where
conditions may vary. At the rst opportunity, stop
the blower and clean or remove the inlet lter.
Also, recheck leveling, coupling alignment or belt
tension, and mountlng bolts for tightness.
START-UP CHECKLIST
It is recommended that these start-up procedures
be followed in sequence and checked off (
) in
the boxes provided in any of the following cases.
During initial installation
After any shutdown period
After maintenance work has been performed
After blower has been moved to a new location
DATES
CHECKED:
Check the unit for proper lubrication. Proper oil level is critical. See Lubrication on page
14. See Recommended Lubricants on page 41 for information on acceptable
lubricants for the product.
Check the V-belt drive for proper belt alignment and tension.
Carefully turn the rotors by hand to be certain they do not bind.
WARNING
!
Disconnect power. Make certain power is
off and locked out before touching any
rotating element of the blower, motor, or drive
components.
“Bump” (an intermittent start, then turned off immediately) the unit with the motor to
check rotation (counterclockwise when facing the shaft) and to be certain it turns freely
and smoothly.
Start the unit and operate it for 30 minutes at no load. During this time, feel the cylinder
for hot spots. If minor hot spots occur, see Troubleshooting on page 37.
Apply the load and observe the operation of the unit for 1 hour.
If minor malfunctions occur, discontinue operation and see Troubleshooting on page
37.