Check Operation and Aeration
Installation
Check Operation
Turn the replace ame up and down using the remote
control to con rm that the full range of inputs is
achieved—see the Remote Control Use starting on page
37.
Adjust Aeration (if necessary)
Light the re and allow the unit to warm up for 1015
minutes to evaluate the ame picture. Burners are
equipped with an adjustable shutter to control primary
aeration. See the gures below. The shutters are
factory-set to an aeration gap which will give optimum
performance for the vast majority of installations.
Depending of fuel bed used, altitude and other
considerations, the ame picture may be improved by
adjusting the aeration. The need for adjustment should
be determined only by operating the appliance with the
fuel bed, liners and window installed and evaluating the
ame picture after a 15-minute warm-up.
Pull or push the aeration lever at the bottom front left
corner of the unit to open or close the air shutter. The
shutter is visible at the left hand end of the burner.
Open
Closed
Increasing aeration (open) w
ill cause the ames to
appear more transparent and blue showing more
ceramic e ects glow.
Decreasing aeration (close) will cause the ames to
appear more yellow or orange showing less ceramic
e ects glow.
Too little aeration may result in black carbon forming
and dropping into the rebox.
Open
inlets
Closed
inlets

Other manuals for Valor G3.5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Valor G3.5 and is the answer not in the manual?

Valor G3.5 Specifications

General IconGeneral
BrandValor
ModelG3.5
CategoryIndoor Fireplace
LanguageEnglish

Related product manuals