EasyManuals Logo

Valtra T214 User Manual

Valtra T214
414 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #282 background imageLoading...
Page #282 background image
Grease the lifting cylinder pins and the lifting links shaft.
1
1
GUID-79D2E886-4FA8-4CF1-82EF-A28E69A1AC99
1. Grease nipple
It is easier to grease all the nipples when the links are lifted up.
4.7.3.6 Checking the front power take-off
Check the front power take-off periodically.
Tighten all fixing screws after the first 10 running hours.
Check regularly that all fixing screws are tight.
Inspect the front power take-off for oil leaks.
Check that the hydraulic connections have no leaks.
4. Maintenance
- 280 -

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Valtra T214 and is the answer not in the manual?

Valtra T214 Specifications

General IconGeneral
TransmissionPowershift
Max Speed50 km/h
Engine Type6-cylinder diesel
Displacement7.4 liters
EngineAGCO Power
Rear Lift Capacity9500 kg
Lift Capacity9, 500 kg
Wheelbase2.995 m
Hydraulic SystemLoad-sensing
Tire OptionsMultiple options available

Related product manuals