EasyManua.ls Logo

Vatech PHT-30CSS - Leveling the Equipment

Vatech PHT-30CSS
162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Installing the Equipment: Base Stand (Optional)
64 vatech A9 (Model:PHT-30CSS) Installation Manual
4.7 Leveling the Equipment
Required Tool
T-shaped Hex
Wench
8 mm / 0.3”
Spirit Level N/A
Ensure to place the Spirit Level on the indicated
locations in this manual for an accurate reading.
1. Prepare a Spirit Level.
2. Turn the Rotating Unit clockwise so that the X-ray tube head faces the front.
3. Turn all nine screws in marked locations clockwise.

Table of Contents

Other manuals for Vatech PHT-30CSS

Related product manuals