4. Installing the Equipment: Base Stand (Optional)
66 vatech A9 (Model:PHT-30CSS) Installation Manual
Leveling the Front and Back
1. Place the Spirit Level vertically, as shown in the image.
2. Turn Screws in marked locations left and right until the Sprit Level bubble comes
to the center.
3. When leveling the equipment is completed, ensure to tighten all eight Screws
until they no longer move.