EasyManua.ls Logo

VBM REPLICA 2B - Page 68

VBM REPLICA 2B
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
ENG
1.5,
PREPARATIONS BY THE PURCHASER.
a) Preparation of the place of installation
The purchaser must prepare a support surface for the machine as described in the paragraph on installation.
b) Electrical preparation
The electric system must comply with the national regulations in force in the place of installation and have an efficient grounding
system.
Fit an omnipolar disconnecting device on the power line upstream of the machine.
The power cables must be sized according to the maximum current required by the machine so that the total
voltage drop at full load is less than 2%.
c) Water supply preparation
Prepare a drain equipped with a siphon and a water mains to supply appropriately softened water with a shut-off valve located
upstream of the machine.
1.6,
EMERGENCY OPERATIONS IN CASE OF FIRE.
a) In case of fire, cut the power to the machine by turning off the main switch.
b) Extinguish the fire using suitable extinguishers.
When the machine is powered, it is strictly prohibited to extinguish a fire with water.
Manuale_Replica2B Elettronica_Rev0_5lingue_03-2016.indd 10 19/04/16 17:28

Table of Contents

Related product manuals