EasyManuals Logo

VERITAS NetBackup 5340 User Manual

VERITAS NetBackup 5340
91 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #68 background imageLoading...
Page #68 background image
Veritas 5340 Appliance
and 5U84 Storage Shelf
cables
This chapter includes the following topics:
Power cables
Network cable
Multi-mode fiber optic cable
SAS3 cable
Twinaxial copper cables
Power cables
Each of the AC power modules in both the Veritas 5340 Appliance and the required
Veritas 5U84 Primary Storage Shelf accept one AC power cable. The optional 5U84
Expansion Storage Shelf also uses one AC power cord in each of its AC power
modules. One end of the AC power cable connects to the power supply on the
appliance or the storage device. The other end of the cable connects to an external
Power Distribution Unit (PDU) on the rack.
Power cables include a live line, a neutral line, and a grounding line.
3
Chapter

Table of Contents

Other manuals for VERITAS NetBackup 5340

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the VERITAS NetBackup 5340 and is the answer not in the manual?

VERITAS NetBackup 5340 Specifications

General IconGeneral
BrandVERITAS
ModelNetBackup 5340
CategoryServer
LanguageEnglish

Related product manuals