S600D
83
Chapter 8 Options
This section lists the UPS options and provides information about installing and configuring the various options, and
their respective functions.
8.1
List of Options
No.
Option name
Note
Model
1
3-in 1-out copper bar
kit
Site installation
S600D
2
32-block internal
battery kit (2-group)
Factory installation contains battery cables, trays and
batteries;
Site installation contains battery cables and trays.
Battery string should be user-prepared
S600D (factory installation,
9Ah battery) S600D (site
installation)
3
32-block battery
internal kit (4-group)
S600D(factory
installation, 9Ah battery)
S600D (site
installation)
4
Battery temperature
sensor kit
Site installation
S600D
5
Protective devices for
short circuit withstand
current
Withstand current: 30kVA, factory installation
S600D
6
SIC card
UF-SNMP810
7
Relay card
UF-DRY410
8
UNITY-DP card
IS-UNITY-DP
9
UNITY-LIFE card
IS-UNITY-LIFE
10
Parallel cable
1m
3m
ITA-20k00AL3A02C00L1
ITA-20k00AL3A02CL3
11
LBS cable
ITA-20k00AL3A02C00L2
12
Backfeed protection
device
Includes backfeed power board, cables, excitation
tripping device; factory installation
S600D
8.2
Option Introduction
Preparation
1.
Prepare the installation tools, including a cross head screwdriver, a pair of insulated gloves, a sleeve, an adjustable
spanner, and a multimeter.
2.
Check that all installation materials are present and complete, including internal batteries, eight battery trays and
the corresponding battery power cables.
Procedures
1.
Shut down the UPS completely.
a)
Disconnect the load
b)
Refer to 5.6.1 Procedures For Completely Shutting Down the UPS for UPS module shut down, and 7.3.5 for
parallel system shut down.
Note
1.
No batteries are supplied with the internal battery kit (site installation).
2.
Battery cables and battery trays are designed according to the specifications of valve-regulated lead acid batteries 12V-
9Ah. If internal battery kits are required for site installation, please purchase batteries having the same specifications.