Commissioning steps
Inspection steps
Maintenance steps Page
•
1. Commissioning the system............................................................................................... 29
• •
2. Filling the heating system................................................................................................. 31
• • •
3. Checking all connections on the heating water and DHW sides for leaks................... 32
•
4. Venting the heating system............................................................................................... 32
•
5. Checking the gas type....................................................................................................... 33
• • •
6. Removing the front panel.................................................................................................. 33
• • •
7. Checking the static pressure and supply pressure........................................................ 34
•
8. Function sequence and possible faults........................................................................... 36
•
9. Setting the maximum heating output............................................................................... 37
• •
10. Performing an actuator test.............................................................................................. 37
•
11. Adjusting the integral circulation pump rate................................................................... 37
•
12. Checking the balanced flue system for leaks (annular gap test).................................. 39
•
13. Burner adjustment when connecting multiple flues to a shared flue system.............. 39
•
14. Removing the burner......................................................................................................... 40
• •
15. Checking the burner gasket and burner gauze assembly.............................................. 41
• •
16. Checking and adjusting the ignition and ionisation electrodes.................................... 42
• •
17. Checking the back draught safety devices...................................................................... 42
•
18. Cleaning the heating surfaces.......................................................................................... 43
• •
19. Checking the condensate drain and cleaning the trap................................................... 43
• •
20. Installing the burner........................................................................................................... 45
• •
21. Checking the neutralising system (if installed)
•
22. Checking the flow limiter (only for gas condensing combi boiler)............................... 46
• • •
23. Checking the expansion vessel and system pressure................................................... 47
• • •
24. Checking the safety valve function
• • •
25. Checking the electrical connections for firm seating..................................................... 47
• • •
26. Checking all gas equipment for leaks at operating pressure........................................ 47
• • •
27. Fitting the front panel........................................................................................................ 48
• •
28. Checking the combustion quality..................................................................................... 48
• • •
29. Checking the flue system for unrestricted flow and leaks
• • •
30. Checking the external LPG safety valve (if installed)
•
31. Matching the control unit to the heating system............................................................ 50
•
32. Adjusting the heating curve.............................................................................................. 50
•
33. Instructing the system user.............................................................................................. 50
Commissioning, inspection, maintenance