Please note
Only start the appliance with a fully filled trap.
Check that the trap has been filled with water.
Commissioning via commissioning assistant
1. Open the gas shut-off valve.
2. If the appliance has not been switched on yet: Turn
on the ON/OFF switch.
Call up the commissioning assistant:
1. and OK simultaneously for approx. 4 s.
2. Use / to select "b.5" and confirm with
"OK".
Note
AP and appear on the display. Confirm with
OK to start the connection with the software tool:
See chapter "Commissioning via software tool".
3. should be pressed for 4 s to start the com-
missioning assistant via the heat generator dis-
play.
3. For further steps, see commissioning assistant in
the following overview.
Commissioning via software tool
Note
Apps for commissioning and service are available for
iOS and Android devices.
1. Open the gas shut-off valve.
2. AP and appear on the display.
Press OK to carry out commissioning with the soft-
ware tool.
3. Select ON and confirm with OK.
4. Follow the instructions in the software tool.
Commissioning assistant
sequence
Explanations and references
Commissioning
"C.1"
Filling program
ON = on
OF = off
Note
It is possible to interrupt or end the process while a rotating rectangle alternat-
ing with the current system pressure is displayed; to do so, press for 3 s.
"C.2"
Venting program
ON = on
OF = off
Note
It is possible to interrupt or end the process while a rotating rectangle alternat-
ing with the current system pressure is displayed; to do so, press for 3 s.
"C.3"
Gas type
2 - Natural gas CPG
3 - LPG (not for appliances with multiple connection)
"C.5"
Flue system
1 - Open flue 60 mm
2 - Room sealed 60/100 mm
3 - Open flue 80/125 mm
4 - Room sealed 80/125 mm
5 - Flexible 60 mm (room sealed or open flue) max. 10 m
6 - Flexible 80 mm (room sealed or open flue) max. 20 m
"C.6"
Flue length
Given in full metres (round up if necessary)
Note
An additional length of 1 m must be factored in for every flue bend.
Commissioning, inspection, maintenance