EasyManua.ls Logo

Viessmann B0KA - Removing the Boiler from the Pre-Plumbing Jig or Mounting Frame

Viessmann B0KA
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
75
Removing the boiler from the pre-plumbing jig or mounting frame
1.
3.
4.
37
37
2.
Fig. 40
Note
When assembling, use new gaskets and, if required,
new locking ring fittings.
Internal gasket diameter:
Gas connection Ø 18.5 mm
Connections on the heating water side Ø 17.0 mm
Gaskets and locking ring connections are available as
individual parts (if required).
Note
When carrying out any work on gas connection fittings,
hold with a suitable tool. Never transfer any forces to
the internal components.
Danger
Escaping gas leads to a risk of explosion.
Check all connections on the gas side (also
inside the appliance) for tightness.
Troubleshooting
Repairs (cont.)
6179762
Diagnosis

Table of Contents

Other manuals for Viessmann B0KA

Related product manuals