EasyManua.ls Logo

Wacker Neuson BH - Page 32

Wacker Neuson BH
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning
8.6 Putting into operation
32
Operator’s Manual | BH | 5100056183 | 10/2022 | [en-US]
1
2
3
1. Push the throttle grip 2 downwards (full throttle position).
2. Pull starter handle 1 gently until you feel resistance, then pull hard.
3. Slowly return the starting handle.
4. When the first engine ignition can be heard, open choke 3.
5. Release throttle grip (idle position).
6. Warm up the engine.
ð Engine runs.

Related product manuals