Commissioning
8.6 Putting into operation
32
Operator’s Manual | BH | 5100056183 | 10/2022 | [en-US]
1. Push the throttle grip 2 downwards (full throttle position).
2. Pull starter handle 1 gently until you feel resistance, then pull hard.
3. Slowly return the starting handle.
4. When the first engine ignition can be heard, open choke 3.
5. Release throttle grip (idle position).
6. Warm up the engine.
ð Engine runs.