4-28 BA E14 track en* 1.3 * E14t_13_400.fm
4 Putting into operation
P: mounting points bottom left and right.
3. Install screws Q and tighten to 110 Nm (81 ft.lbs.).
4. Put caps on all screws and nuts.
Document box (option)
A document box behind the seat is available as an option.
12 V connection
A 12 V connection is located at the rear right inside the cabin and on the
right outside of the cabin.
Maximum permissible current intensity for both connections: 15A