69
EPG-SPRINT XE
OPERATING MANUAL
VERSION 09/2017 ORDER NUMBER DOC2354913
Section Type of inspection Requirements Inspection by Type of inspection Inspection
interval
1 Ground leaking resistance from the
work piece attachment point
The resistance to ground of
every work piece's locating point
must not exceed 1 megohm
(measurement voltage must be
1000 V). The form of construction
of the work piece mount must
guarantee that the work pieces
remain grounded during coating.
SP ME/CM
Measure resistance to ground
(work piece receiver - ground
potential)
max. 1 megohm @ 1000 V.
weekly
2 Link between technical ventilation
equipment and high voltage,
compressed air and coating
material supply
The technical ventilation should
be interlocked such that the high
voltage cannot be switched on
while the technical ventilation is not
working eectively.
SP FT
Test whether the system is safely
stopped and the product supply,
supply air, and high voltage
are switched o when the
ventilation is shut down.
annually
3 Checking the electrostatic manual
coating system for damage
Electrostatic manual coating
systems may only be operated in an
undamaged condition. Damaged
devices must be decommissioned
immediately and repaired
immediately.
SP FT
Inspect and test (e.g., by
measurement) whether all parts
carrying high voltage do not
result in discharge which puts
people at risk.
weekly
Legend:
MF = Manufacturer
ER = Employer
SP = Skilled person
FPO = Fire prevention ocer
ELT = Electrician
TP = Trained person
FT = Function test
ME = Measurement
OC = Organization check
VI = Visual inspection
CM = Constant monitoring
TT = Technical testing