EasyManua.ls Logo

Weider Pro 4100 - Page 17

Weider Pro 4100
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
41. Wrap the Low Cable (47) around a 3 1/2" Pulley
(38). Attach the Pulley to the indicated bracket on
the Left Base (2) with a 3/8" x 2" Bolt (62) and a
3/8" Nylon Locknut (70).
42. Wrap the Low Cable (47) around a 3 1/2" Pulley
(38). Attach the Pulley to the indicated bracket on
the Left Base (2) with a 3/8" x 2" Bolt (62) and a
3/8" Nylon Lecknut (70).
43. Wrap the Low Cable (47) around a 3 1/2" Pulley
(38). Attach the Pulley and a Cable Trap (91) to
the second set of holes from the bottom of the
indicated Double =U"-Bracket (56) with a 3/8" x 2"
Bolt (62) and a 3/8" Nylon Locknut (70). Be sure
the Cable Trap is turned to hold the Cable in
the groove of the Pulley.
44. Wrap the Low Cable (47) around a 3 1/2" Pulley
(38). Attach the Pulley to the indicated bracket on
the Right Base (1) with a 3/8" x 2" Bolt (62) and a
3/8" Nylon Locknut (70).
56- ,:1 I till
r I ;.3
¢ ql
17

Related product manuals