General information for gas operation
When installing a gas combustion system, regulations
and guidelines must be observed (i.e. Local Codes of
Practice and Regulations).
The subcontractor responsible for the installation or
changes to the gas system must inform the gas
supplier of the type and extent of installation planned
and the work intended.
The subcontractor must ascertain that an adequate gas
supply to the installation is ensured.
Installations, alterations and maintenance work on gas
systems in buildings and below ground, must only be
carried out by installers who have a contract with the
gas supplier.
The gas pipework must be subject to a preliminary and
main test or the combined loading test and soundness
test, according to the pressure range intended. Burner
must be isolated.
The air or purge gas required for the test must be
expelled from the pipework. The pipework must be
completely purged.
Gas characteristics
The following information must be obtained from the gas
supplier:
Type of gas
Calorific value in MJ/m
3
or kWh/m
3
Max. CO
2
content of flue gas
Gas supply pressure.
Pipe thread connection
Only tested and approved sealing material should be
used. Please observe the prevailing user instructions!
Soundness test
see Ch. 4.6
Conversion to other gases
When converting to another gas type, a conversion kit
and re-commissioning is required.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Weishaupt WG10 1-C Series and is the answer not in the manual?

Weishaupt WG10 1-C Series Specifications

General IconGeneral
BrandWeishaupt
ModelWG10 1-C Series
CategoryBurner
LanguageEnglish

Related product manuals