EasyManua.ls Logo

Welch Allyn Connex - Remove Ground Lug;Ac Power Harness Assembly;And IEC Connector (Sec B)

Welch Allyn Connex
220 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Remove the four Torx screws.
3. Remove the power supply.
Reassembly note
When reinstalling the power supply, orient the board so that the end of the board with
the AC-to-power-supply (J1) connection is closest to the IEC connector.
Remove the ground lug, AC power harness assembly, and IEC connector
Note Do not disconnect the AC power harness from the IEC connector unless
you are replacing it. Once your disconnect the AC power harness, you
cannot reuse it.
Complete the following preliminary steps:
Power down the system and disconnect the AC power cord.
Remove the system from the wall and remove the battery.
Remove the handle module assembly.
Open the chassis.
1. Disconnect the AC power harness and ground from the power supply.
Service manual Section B 121

Table of Contents

Other manuals for Welch Allyn Connex

Related product manuals