EasyManua.ls Logo

Western tornado - Mounting the Spreader; Spreader Mounting Procedure

Western tornado
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lit. No. 95748/95749, Rev. 04 12 January 1, 2017
MOUNTING THE SPREADER
NOTE: Periodically throughout the snow and ice
control season, verify that mounting devices
are secure.
1. Remove the tailgate from the truck.
2. The spreader can be moved into the truck bed
either by lifting the spreader by the four lifting
handles located on the corner legs or by sliding
the spreader into the truck bed from the ground.
3. To lift the spreader into the truck bed from the
ground, stand the spreader up on the feet at the
rear of the spreader. The chute must be removed
and the knobs that secure the chute cover
screwed all the way in.
CAUTION
Before lifting, verify that hopper is empty of
material. The lifting device must be able to
support the spreader's weight as shown in
the spreader specications table.
Lifting Handles
(Both Sides)

Related product manuals