Marine Installation Manual 2022-03 4-1
4 Ancillary Systems
X62DF-S2.0
4 Ancillary Systems
Sizing the ancillary systems of the engine, i.e. for freshwater cooling, lubricating
oil, fuel oil, etc., depends on the contracted maximum engine power. If the ex-
pected system design is out of the scope of this manual, then contact our repre-
sentative or WinGD directly.
The GTD application provides data for estimating the size of ancillary equipment
and enables all engine and system data at any Rx rating within the engine rating
field to be obtained. However, for convenience or final confirmation when opti-
mising the plant, WinGD provides a computerised calculation service.
All pipework systems
must be flushed and
proved clean before
commissioning
All pipework systems and fittings are to conform to the requirements laid down
by the legislative council of the vessel’s country of registration and the classifica-
tion society selected by the owners. They are to be designed and installed to ac-
commodate the quantities, velocities, flow rates and contents identified in this
manual, set to work in accordance with the build specification as approved by
the classification society and protected at all times from ingress of foreign bodies.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the WinGD X62DF-S2.0 and is the answer not in the manual?

WinGD X62DF-S2.0 Specifications

General IconGeneral
BrandWinGD
ModelX62DF-S2.0
CategoryMarine Equipment
LanguageEnglish