EasyManua.ls Logo

Wolf CGB-2-24 - Page 20

Wolf CGB-2-24
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20 3064810_201804
10.Installationdimensions
Bild: Bohrlöcher für Einhängewinkel
Seite 12
Bild: Einhängeverstrebung an der Gastherme
1. Mark the Ø12 holes to be drilled for the suspension bracket,
taking into account the minimum clearances.
2.Inserttherawlplugsandtthesuspensionbracketusing
the screws supplied.
3. Hook the boiler onto the suspension bracket using the
mounting stay.
Mounting stay
Fig: Mounting stay on the combi boiler
Fig: Drill holes for suspension bracket
Securingtheappliancewiththesuspension
bracket
Wheninstallingtheappliance,ensurethatthexings
havesufcientload-bearingcapacity.Alsotakeinto
account the condition of the wall,as an escape of
gas or water might result in a risk of explosion and
ooding.
Bild: Bohrlöcher für Einhängewinkel
Seite 12
Bild: Einhängeverstrebung an der Gastherme
min. 552 mm
Ceiling

Other manuals for Wolf CGB-2-24

Related product manuals