13.Fittingthetrap
Thetrapmustbelledwithwaterpriorto
commissioning.Operatingtheappliancewith
anemptytrappresentsariskofpoisoning
orasphyxiationduetouegasesescaping.
Unscrewthetrap,removeandlluntilwater
runsoutofthedrainholeontheside.Ret
thetrapandensurethegasketsealstightly.
Before commissioning, carry out a tightness
testonallhydraulicpipework:
TestpressureontheDHWsidemax.10bar
Testpressureontheheatingwatersidemax.
4.5 bar
Condensateconnection
First, grip the control unit cover on the r.h. side and swivel to the
side. Then undo the two screws on the r.h. and l.h. sides of the
front casing. The front casing can then be released upwards.
Fill the supplied trap with water and connect it to the conden-
sate pan connector.
The drain hose must be safely secured above the drain outlet
(trap).
If the condensate is directly routed to the drain pipe, ventilation
must be provided so that the drain pipe cannot affect the gas
condensing boiler.
If installing a neutralising system (accessories), observe the
instructions supplied.
According to Code of Practice ATV-DVWK- A251 [Germany],
no neutralising system is required for condensing boilers up
to 200 kW.
If a neutralising system is used, the national regulations
regarding the disposal of residues from such systems apply.
ConnectiontoWolfcylinder
A detailed description is included with the connection set
(accessories).
Fig:
Connection set for Wolf cylin-
der CSW-120
Installationonunnishedwalls
(accessories)
Fig:
Connection set for Wolf cylinder
CSW-120
Installationonnishedwalls
(accessories)
Fig: Trap
Anschluss Wolf - Speicher
Bild 1: Anschlussset für Unterputzinstallation
Bild 2: Anschlussset für Überputzinstallation