72 3064810_201804
37.Technicalinformation,
air/uegasrouting
Air/uegasrouting
Fluegasroutingoptions
Maximumlength
1)
[m]
up to
14kW
up to
20kW
up to
24kW
B23
Flue inside a duct and combustion air directly through the boiler
(openue)
DN60
DN80
45
-
25
50
21
50
B33
Flue in a duct with horizontal, concentric connection line
(openue)
DN60
DN80
43
50
23
50
19
50
B33
Connection to a moisture-resistant chimney with
horizontalconcentricconnectionpipe(openue)
Calculation to EN 13384
(room sealed balanced
uemanufacturer)
C13x
Horizontal roof outlet through a pitched roof,
(room sealed - on-site dormer)
DN60/100
DN80/125
10
10
10
10
10
10
C33x
Verticalconcentricroofoutletthroughapitchedoratroof
Verticalconcentricbalancedueforinstallationinaduct(roomsealed)
DN60/100
DN80/125
DN110/160
16
17
18
14
22
25
12
26
30
C43x
Connectiontoamoisture-resistantbalanceduechimney(roomsealed
balancedue)
Maximum pipe length from the centre of the boiler bend to the connector 2 m
(room sealed)
Calculation to EN 13384
(room sealed balanced
uemanufacturer)
C53
Connectiontoueintheductandventilationairsupplythroughexteriorwall
(room sealed), incl. 3 m ventilation air duct
DN80/125 50 50 50
C53x
Connectiontoaueonanexternalwall(roomsealed)
Combustion air intake via external wall
DN80/125 50 50 50
C83x
Connectiontoueinaductandventilationairthroughexternalwall
(room sealed)
DN80/125 50 50 50
C83x
Concentric connection to a moisture-resistant chimney
and combustion air through an external wall (room sealed)
Calculation to EN 13384
(room sealed balanced
uemanufacturer)
C93x
Flue for installation in a duct
Connecting pipe DN60/100, vertical DN60
rigid
exible
17
13
17
13
17
13
C93x
Flue for installation in a duct
Connecting pipe DN60/100 or DN80/125, vertical DN80
rigid
exible
18
14
21
17
26
22
1)
Themaximumlengthcorrespondstothetotallengthfromtheappliancetotheueterminal.
Foravailableliftingpressuresofgasfans,seespecication.
Note:SystemsC33xandC83xarealsosuitablefor
installationingarages.
Where necessary, adapt the installation examples to the
relevant building regulations and requirements in your
country/region. Any questions relating to the installation,
particularly regarding the provision of inspection
components and ventilation apertures (ventilation generally
required above 50 kW output) should be raised with your
localuegasinspectorpriortoinstallation.
Thespeciedlengthsrefertoconcentricbalanced
uesandstandardues,andapplytooriginalWolf
componentsonly.
BalanceduesystemsDN60/100andDN80/125
arecertiedassingleunitstogetherwithWolfgas
condensingboilers.
Thefollowingbalanceduesorstandardueswith
CE-0036-CPD-9169003certicationmaybeused:
- Flue pipe DN80
- ConcentricbalancedueDN60/100andDN80/125
- Flue pipe DN110
-
Concentricbalancedue(onexternalwalls)DN80/125
- FlexibleuepipeDN83
Wolf accessories are supplied with the relevant necessary
identicationlabels.
Please also observe the installation information supplied
with the accessories.