3064458_201811
87
Connectiontoamoisture-resistantuewithtwoormultipledraughtchimneys(shaft)
The requirements of DIN 18160-1 supplementary sheet 3 apply.
Notify your local ue gas inspector prior to installation.
Open ue operation only
Stainless steel shaft cover
from the Wolf product range
Polypropylene system up
to 120 °C, CE approved
Chimney
T400
Open ue and balanced ue operation
1000
Shaft cover from the
Wolf product range
Chimney
T400
Polypropylene system up
to 120 °C, CE approved
SupplementaryinstallationinstructionsforbalancedueDN60/100
Determine distance A. Length of balanced ue (4) always approx.
100 mm longer than distance A. Always trim the ue pipe on the
smooth side, never on the female connection side.
Chamfertheuewithaleaftertrimming.
Distance A
Offset
Distance A
Distance A
Bend Offset
87 ° min. 170 mm
45 ° min. 73 mm
Flat roof: Afx ceiling outlet (7), approx. Ø 130 mm, to the
roof cover.
Pitched roof: For (6), observe the installation instructions on the
cowl regarding roof pitches.
If an inspection aperture is required for the balanced ue, insert a
balanced ue with inspection aperture (2) (200 mm length).
Insert roof outlet (5) into the roof from above and secure vertically
with the mounting bracket to a rafter or brickwork.
Install the roof outlet only in its original condition.
Modicationsarenotpermissible.
Mounting bracket
6
7
5
650550-1050
2000
Connectiontoauegaschimney(examples)DN60/100
Connectiontoamoisture-resistantuegaschimneyB33
Install ue gas chimney connections with air apertures directly on the ue gas chimney
as shown in the diagram, so that all components of the ue gas path are surrounded
by combustion air.
The air apertures must be completely free from obstruction.
The ue gas chimney must be tested for suitability. Apply 0 Pa when calculating the
chimney draught. Obtain the connection piece from the chimney manufacturer if re-
quired, to safeguard the connection conditions.
31.Technicalinformation,balancedue