EasyManuals Logo

Worcester GREENSTAR HIGHFLOW 440CDI ERP Installation, Commissioning And Servicing Instructions

Worcester GREENSTAR HIGHFLOW 440CDI ERP
52 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #15 background imageLoading...
Page #15 background image
PRE-INSTALLATION
6720818077 (2016/04) - Greenstar Highflow CDi
ErP
15
3.6 Boiler location and clearances
This is a floor-standing boiler and is only suitable for installing on the
floor, internally in a property
Install onto a rigid non-combustible surface at least the same size as
the boiler and capable of supporting the boiler weight.
The boiler is not suitable for external installation unless a suitable
enclosure is provided.
Compartments
Follow the requirements of BS6798 and BS5440 Part 2 and note:
Minimum clearances must be maintained.
An access door is required to install, service and maintain the boiler
and any ancillary equipment.
If fitting the boiler into an airing cupboard use a non-combustible
material to separate the boiler from the airing space, that can be
perforated with holes up to 13mm.
3.6.1 Boiler clearances
There are several clearances to be considered when either installing or
servicing a boiler in an unventilated or ventilated compartment.
Fig. 12
Clearances
Refer to figure 12 and the table below for the minimum clearances.
3.6.2 Airing cupboard clearances
The dimensions below show the minimum space required to install and
service the boiler within an airing cupboard.
If a compartment is built around the boiler after installation, then the
compartment must be separated from the boiler space by a
non-combustible partition as described in BS 6798.
Fig. 13 Airing cupboard clearances
3.6.3 Vented compartments
If the clearances available are less than those stated for an unventilated
compartment or an airing cupboard then ventilation must be provided as
described in BS 5440.
A minimum of two air vents of equal size must be fitted, one at low level
and another at high level on the same wall using the same air for
circulation.
Fig. 14 Venting compartments
item Minimum distance requirements for compartments
1 Overall height of compartment
2 Overall depth of compartment
3 Overall width of compartment
4 Height above the boiler to top of compartment
5 Depth to front of boiler (or shelf)
6 Gap between sides of boiler and compartment
7 Gap between shelf and back of compartment
Compartment clearances (mm)
item Installation Servicing Unventilated
1 1450 865 900
2 1200 1200 800
3 610 610 800
4 600 15 50
5 600 600
1)
1) Can be reduced to 25mm to a removable door or panel
200
2)
2) Space required with removable door or panel
65 5100
3)
3) Can be reduced to 50mm on one side but maintaining the overall 200mm
minimum
6720818077-08.1Wo
item Minimum clearances (mm)
1 2300
2 625
3 800
4 200
525
1)
1) From the front of the boiler and the front of the shelf
6 100
7 100
item Boiler Air source Minimum area of vent
1 440CDi
ErP
Internal room or space 310cm
2
550CDi
ErP
440cm
2
2 440CDi
ErP
Outside 155cm
2
550CDi
ErP
220cm
2
3All 100mm space between the boiler and vent
6720818077-09.1Wo
1

Table of Contents

Other manuals for Worcester GREENSTAR HIGHFLOW 440CDI ERP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Worcester GREENSTAR HIGHFLOW 440CDI ERP and is the answer not in the manual?

Worcester GREENSTAR HIGHFLOW 440CDI ERP Specifications

General IconGeneral
ModelGreenstar Highflow 440CDi ErP
CategoryBoiler
TypeCombi
ErP RatingA
Hot Water Flow Rate20 l/min
Fuel TypeNatural Gas
Gas TypeNatural Gas
Warranty5 years
MountingWall Mounted

Related product manuals