Important
To replace the Fuser Belt Module correctly, it is important to know about the 3 alignment
points. There are two in the front and one in the back of the assembly. Proper alignment
ensures proper performance.
1. Place the Fuser Belt Module Handles on each side of the belt and reinsert the required
Fuser Belt Module into the Fuser Assembly.
Xerox
®
 Versant™ 2100 Press5-28
Quick Start Guide
Maintenance