JOHNSON CONTROLS
3
FORM 150.72-ICOM7
ISSUE DATE: 10/22/2020
Manual Description Form Number
Start-Up Checklist - Style A and B 150.72-CL1
Renewal Parts - YLAA0180 - YLAA0517 Style B 50 Hz 150.72-RP4
Limited Warranty Engineered Systems Equipment 50.05-NM2
Engineering Supplement - Air-Cooled Liquid Chillers Condenser Corrosion Protection 150.12-ES1
IOM - YLAA0041 - YLAA0230 Air-Cooled Scroll Chiller with Brazed Plate Heat Exchanger, Style B
(60 Hz)
150.72-ICOM6
CHANGEABILITY OF THIS DOCUMENT
In complying with Johnson Controls’ policy for con-
tinuous product improvement, the information con-
tained in this document is subject to change without
notice. Johnson Controls makes no commitment to
update or provide current information automatically
to the manual or product owner. Updated manuals, if
applicable, can be obtained by contacting the nearest
Johnson Controls Service office or accessing the John-
son Controls QuickLIT website at http://cgproducts.
johnsoncontrols.com.
It is the responsibility of rigging, lifting, and operating/
service personnel to verify the applicability of these
documents to the equipment. If there is any question
regarding the applicability of these documents, rig-
ging, lifting, and operating/service personnel should
verify whether the equipment has been modified and
if current literature is available from the owner of the
equipment prior to performing any work on the chiller.
ASSOCIATED LITERATURE
AFFECTED PAGES DESCRIPTION
3 Conditioned Based Maintenance information added
REVISION NOTES
Revisions made to this document are indicated in the following table. These revisions are to technical information,
and any other changes in spelling, grammar, or formatting are not included.
CONDITIONED BASED MAINTENANCE
Traditional chiller maintenance is based upon assumed
and generalized conditions. In lieu of the traditional
maintenance program, a Johnson Controls YORK
Conditioned Based Maintenance (CBM) program can
be substituted. This CBM service plan is built around
the specific needs for the chiller, operating conditions,
and annualized impact realized by the chiller. Your lo-
cal Johnson Controls Branch can propose a customized
Planned Service Agreement that leverages real time
and historical data, delivering performance reporting,
corrective actions required and data enabled guidance
for optimal operation and lifecycle assurance. The pro-
gram will include fault detection diagnostics, operation
code statistics, performance based algorithms and ad-
vance rules based rationale delivered by the Johnson
Controls Connected Equipment Portal.