EasyManua.ls Logo

Zennio DALIBOX Interface 64/32 - Page 29

Zennio DALIBOX Interface 64/32
71 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
DALIBOX Interface 64/32
http://www.zennio.com Technical Support: http://support.zennio.com
29
Name: desired identifier for the ballast (up to twelve characters).
Enable Operating Time Counter Object [enabled/disabled]: enables the
[ECG N] Operating Time four-byte object, which shows (in seconds,
although updated every hour) how much time DALIBOX Interface 64/32 has
been regulating the ballast with a dimming level greater than 0%. This object
can be overwritten to change the value, for example in case of a ballast
replacement. It can also be reset by means of the “Installation” menu on the
display, as detailed in section 2.8.
ECG type [Normal ECG / Self-contained Battery Light (Converter) / LED
Module]: in case of selecting Self-contained Battery Light (Converter), the
following parameters are shown:
Value in Emergency Mode [0…100] [%]: sets the brightness level of the
lamp in emergency mode.
Prolong Time on Recovery [0…20] [min]: sets the time to remain in the
extended emergency mode after main voltage recovery.
Function Test Interval [0…255] [days]: sets the periodic time for automatic
execution of the test which checks the proper function of the converter.
Duration Test Interval [0…52] [weeks]: sets the periodic time for automatic
execution of the test which checks converter is working properly in case of
power failure.
Partial Duration Test Interval [0…52] [weeks]: sets the periodic time for
automatic execution of partial duration test. This test checks faster than
duration test that, in case of power failure, the battery life is appropriate.
Partial Duration Test Duration (0 = Disabled) [0…60] [min]: sets the
duration time for automatic execution of the partial duration test.
Test Execution Timeout [0…255] [days]: sets the maximum time after
which the function test or duration test must be executed. If a test has not
ended within this time the result will indicate max delay exceeded.