801314 v3.05 09.20 HT BC Commercial Instructions Page 23 of 28
Do not commission your HydroTap until it is ready to be used! The HydroTap is designed to be installed,
commissioned and used within 48 hours. If your HydroTap is left idle before use, a filter change and
sanitisation may be required.
• Turn ON the water and check for any leaks.
•
Turn the power ON at the power outlet and at the side of the Command Centre.
•
If fitted, ensure the Booster is turned OFF.
•
Familiarise yourself with the operation of the Tap, in preparation for use (see User Guide)
•
After commissioning, the system may be customised by selecting further options (see Settings, in the User Guide).
1. Turn the stop cock ON
2. Press [Start] [Stop] buttons to start and stop the filter flush.
3. Allow at least 10 litres of water to flush through the filter.
4. Once the filter flush is finished, Turn the stop cock OFF
then press [Stop] to end filter flush mode.
5. Press [Next] and the View screen will show the Boiling
calibration mode.
NOTE: For any subsequent lter changes or any operational
procedures, please refer to the HydroTap user guide, located
inside the lter housing access door.
A new filter cartridge is provided (but NOT fitted), inside the
filter door. Unpack the new filter cartridge and write today’s
date on the label. To install the cartridge, align the key tabs
and insert upwards into the filter head. Turn the cartridge to
the right until it locks in place.
Have a 10L bucket or similar container (not supplied) ready
to hold a quantity of water that will be ejected while the
Filter Flush Mode is in operation. Open the filter access door
on the front of the HydroTap and the filter cartridge will be
exposed. Located to the rear RHS of the cartridge is a flush
line and the flush line stop cock. Place the valve end of the
flush line into the 10L bucket or container.
6.2 - Filter Flush
Section 6
Commissioning
6.1 - Select the Language
Initial Commissioning screen
Language selection screen
Boiling Chilled
10:30 Wed 04,Jul 2018
Boiling Chilled
10:30 Wed 04,Jul 2018
Boiling Chilled
10:30 Wed 04,Jul 2018
1
1
2
OPEN
CLOSED
Stop cock operation
!