EasyManua.ls Logo

Zip HydroTap G4 - Boiling Calibration; Booster

Zip HydroTap G4
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 24 of 28 801314 v3.05 09.20 HT BC Commercial Instructions
1. Press the [MENU] button for main menu.
2. Press the [Install] button.
3. Press the [Booster] button.
4. In the next screen, press YES to enable the
Booster.
5. Turn the Booster ON
6. Water must be run through the Booster for a min
of 30 seconds, before the heater will activate.
7. Dispense boiling water for 30secs and check the
Booster outlet hose is warm when the boiling
water tank is replenishing.
HydroTap Booster Screen
6.3 - Boiling Calibration
Commissioning
6.4 - Booster
Press the calibration button and the system will
commence the Boiling calibration procedure. This
will take approx 5-6 minutes.
Upon completion, a Booster reminder screen will
appear and allow you to return home by pressing
the [Home] button.
Check the Date and Time settings (see Note
below)
To enable Booster (when installed)
NOTENOTE: Failing to make the correct selection for the “Booster” will affect product performance.
NOTENOTE: Depending on your location you may need to re-set the internal clock. See section G of the user
guide to check and if necessary, reset the Date and Time for your time zone.
Boiling Chilled
10:30 Wed 04,Jul 2018
Boiling Chilled
10:30 Wed 04,Jul 2018
Boiling Chilled
10:30 Wed 04,Jul 2018

Other manuals for Zip HydroTap G4

Related product manuals