EasyManua.ls Logo

ZOLL PD 2000 - Page 51

ZOLL PD 2000
93 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHECKOUT.
PROCEDURES
SECTION
8.
MFE
TESTS
Note:
Perform
steps
8.2
and
8.3
on
PD
2000
and
D
2000
units
only.
Perform
this
Action:
Look
for:
Circle
the
Result
81
Install
Multi-Function
"ELECTRODES"
message
YES
NO
Cable.
appears
on display.
8.2
MFC
should
be
installed
"ELEC.
PADS
OFF"
and
YES
NO
but not
connected
to
the
"ANALYSIS
HALTED"
test
connector.
Press
messages
appear
on
display.
ANALYZE
button.
83
Connect
MFC
to
ZOLL
S-3000
simulator.
Press
ANALYZE
button
"NO
SHOCK
ADVISED"
YES
NO
for
Normal
Sinus
rhythm.
|
message
appears
on
CRT.
Press
ANALYZE
button
|
"SHOCK
ADVISED"
YES
NO
for
Ventricular
Fibrillation
|
message
appears
on
CRT.
rhythm.
|
Press
ANALYZE
button
|
"NO
SHOCK
ADVISED"
YES
NO
for
Asystole
rhythm.
message
appears
on
CRT.
84
Set
to
energy
level
2]
and
"ELECTRODES
OFF"
YES
NO
charge.
Attempt
discharge
|
message
appears
on
CRT.
(without
test
connector).
8.5
Plug
MFC
into
test
Unit
discharges.
YES
NO
connector,
charge
to
2]
and
discharge.
8.6
Charge
to
100]
and
"TEST
OK" message
appears
|
YES
NO
discharge.
on
CRT.
“TEST
OK"
message
on
strip.
YES
NO
SECTION
9.
REAL
TIME
CLOCK
TEST
Perform
this
Action:
Look
for:
Circle
the
Result
9.1
Correct
date
and
time
Correct
date
and
time
YES
NO
displayed.
displayed.
1-39

Related product manuals