08 COMMISSIONING
3BHS213401 E01 REV H ACS1000 AIR-COOLED USER MANUAL 112/184
8.2.7 Power supply checklist
8.2.8 Miscellaneous checklist
1.
Medium voltage available for start-up of drive
□
2.
Low voltage auxiliary power available for start-up of drive
□
1.
Sufficient number and correct type of spare parts available
□
2.
Air conditioning of drive room ready for load run of drive
□
3.
Optional equipment ready
□