58 Location of fieldbus and pulse
encoder interface
62 Transporting the cabinet by
crane
63 Recommended forklift
position
63 Using one pallet truck
70 Fixing the base to the floor
79 Grounding drive system and
integrated transformer
80 Grounding drive system and
non-integrated transformer
81 Drive with integrated
transformer
82 Heating cable connection
84 Preparing power cables for
EMC plates
85 Top and bottom cable entry
with EMC plates
86 Bolted busbar connection
87 Cable entry options
88 Preparing control cables for
EMC plates
88 Shield grounding point for
encoder cable
107 Local operator panel
118 CDP control panel
135 Device identification
136 Alarm / fault identification
139 AMC circuit board
140 IOEC module
141 AF 100 interface
142 NETA-21 remote monitoring tool
144 Modbus RTU interface
144 Profibus interface
149 Four-way grounding set
150 Location of door safety switch
151 Pivoted door handle
152 Replacing filter mats
153 Phase module location
154 Phase module replacement kit
155 Using the phase module replacement
kit