EasyManua.ls Logo

ABB MB3000 Series - Installing the Source Module

ABB MB3000 Series
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 7 Module Replacement Installing the Source Module
AA003700-01 rev. G. 2.0 33
STEP 5 Remove the source control board from the spectrometer and gently unplug the
two connectors
STEP 6 Unscrew with a 2.5 mm Hex driver the 3 captive screws of the Source module.
STEP 7 Remove the Source module from the spectrometer.
Installing the Source Module
STEP 1 Power OFF the spectrometer. Refer to Lockout/Tag Out Procedure on page 10.
STEP 2 Set the Source module into place.
STEP 3 Connect all two connectors and tighten the 3 captive screws holding the Source
Module into place. Do not overtighten.
STEP 4 Set the source control board (installed on its bracket) into place. Refer to
Figure 7- 4.
You do not need to cut the wires connecting the source control board to the source
module. The replacement kit includes the source and the source control board.
Connectors are fragile, make sure to manipulate connectors with caution.
After installing the Source module, check the LED statuses to make sure
spectrometer is ready for use. Refer to Table 6- 1. A delay may be required to
allow spectrometer initialization and stabilization.

Table of Contents

Related product manuals