ABB ProcessMaster 300 User Manual

ABB ProcessMaster 300
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
SM/FEX300/FEX500/FM/CSA-EN
ProcessMaster, HygienicMaste
r
FEX300, FEX500
FM / cFM Div. 1, Div. 2
Safety information for electrical
equipment for potentially explosive areas
in accordance with Factory Mutual
Standards and Canadian Standards
Association
Electromagnetic Flowmeter

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the ABB ProcessMaster 300 and is the answer not in the manual?

ABB ProcessMaster 300 Specifications

General IconGeneral
BrandABB
ModelProcessMaster 300
CategoryMeasuring Instruments
LanguageEnglish

Summary

Safety

Electrical Installation Safety

Essential steps for safe electrical connection and grounding.

Device Designs

Compact Design Div. 1

Specifications for compact designs in Division 1 hazardous areas.

Compact Design Div. 2

Specifications for compact designs in Division 2 hazardous areas.

Remount Mount Design Div. 1

Specifications for remount mount designs in Division 1.

Remount Mount Design Div. 2

Specifications for remount mount designs in Division 2.

Mounting

Combustible Dust Areas

Guidelines for operating devices in areas with combustible dust.

Electrical Connection Procedure

Procedures and standards for electrical connections.

Ex Relevant Specifications for Div. 1

Electrical Connection in Div. 1

Wiring details for sensors and transmitters in Division 1 hazardous areas.

HART Protocol Electrical Data Div. 1

Electrical parameters for HART devices in Zone 1/Div. 1.

Fieldbus Electrical Data Div. 1

Electrical parameters for PROFIBUS PA/FOUNDATION fieldbus in Zone 1/Div. 1.

Ex Relevant Specifications for Div. 2

Electrical Connection in Div. 2

Wiring details for sensors and transmitters in Division 2 hazardous areas.

HART Protocol Electrical Data Div. 2

Electrical parameters for HART devices in Zone 2/Div. 2.

Commissioning

Preliminary Commissioning Checks

Mandatory checks before starting the device commissioning.

Maintenance

Related product manuals