EasyManua.ls Logo

ABB ProcessMaster 300 - Rotating the Transmitter Housing; Cable Entries

ABB ProcessMaster 300
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting
SM/FEX300/FEX500/FM/CSA-EN FEX300, FEX500 EN - 17
4.2 Rotating the transmitter housing
Dual compartment housing Single compartment housing
Fig. 9
1. Loosen the Allen screws (3) on the front and back sides, but do not remove entirely.
2. Loosen screws (2) and rotate the transmitter housing (1) by 90° to the left or right.
3. Retighten screws (2) and Allen screws (3).
DANGER - Risk of explosion!
When the screws for the transmitter housing are loosened, the explosion protection is
suspended.
Tighten all screws (2, 3) for the transmitter housing prior to commissioning.
4.3 Cable entries
Dual compartment housing Single compartment housing
Fig. 10
The devices are delivered with 1/2" NPT or PF 1/2" threads with protective shipping plugs (1).
Unused cable entries must be closed prior to commissioning using either approved threaded
pipe connections or cable glands according to national regulations (NEC, CEC).
Make sure that the threaded pipe connections, cable glands and possibly plugs are installed
properly and sealed.
If the device is to be operated in areas with combustible dusts, a threaded pipe connection or
cable gland with suitable approval must be used.
G00761-01
1
3
2
3
3
G00759-01
1
1
1
1

Table of Contents

Related product manuals