- 135 -
000878BG
7 - Operation
7. Remove the DC cables from the PV connectors
19 20 21
Using the current clamp check the absence of current on DC side,
measurement each positive and negative DC input string, refer to
red area (check the correct setting of the current sensor).
Remove all quick t DC connector
19 20 21
(PV Connector) from
the wiring box. To avoid mechanical interferences, use a cable tie to
collect the disconnected cables.
8. Discharge of the capacitor
Wait the internal capacitors to be discharged. The discharge time of
the stored energy, is indicated on the regulatory label – 30 minutes.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the ABB PVS-50-TL and is the answer not in the manual?

ABB PVS-50-TL Specifications

General IconGeneral
BrandABB
ModelPVS-50-TL
CategoryInverter
LanguageEnglish

Related product manuals