ABB REB670 - Example How to Connect Single-Phase CT to the IED

ABB REB670
554 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A
IA
IB
IC
B C
Protected Object
IED
C
T
8
0
0
/1
in
D
e
lta
D
C
A
C
o
n
n
e
cte
d
IC-IB
IB-IA
IA-IC
2
3
4
ANSI11000028-2-en.vsd
SMAI_20
ANSI11000028 V2 EN-US
Figure 25: Delta DAC connected three-phase CT set
In this case, everything is done in a similar way as in the above described example,
except that for all used current inputs on the TRM the following setting parameters
shall be entered:
CT
prim
=800A
CT
sec
=1A
CTWyePoint=ToObject
ConnectionType=Ph-Ph
It is important to notice the references in SMAI. As inputs at Ph-Ph are expected to be
A-B, B-Crespectively C-A we need to tilt 180º by setting ToObject.
4.2.2.7 Example how to connect single-phase CT to the IED
SEMOD55055-431 v8
Figure
26 gives an example how to connect the single-phase CT to the IED. It gives an
overview of the required actions by the user in order to make this measurement
available to the built-in protection and control functions within the IED as well.