EasyManua.ls Logo

ABB Relion 670 series - Page 742

ABB Relion 670 series
1432 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
internal signal
FuseFailDetDVDI
at the level high, then the signal
FuseFailDetDVDI
will remain high
as long as the voltage of three phases are lower then the setting VPPU.
In addition to fuse failure detection, two internal signals
DeltaV
and
DeltaI
are also generated by
the delta current and delta voltage DVDI detection algorithm. The internal signals
DelatV
and
DeltaI
are activated when a sudden change of voltage, or respectively current, is detected. The
detection of the sudden change is based on a sample analysis algorithm. In particular
DelatV
is
activated if at least three consecutive voltage samples are higher then the setting
DVPU
. In a
similar way
DelatI
is activated if at least three consecutive current samples are higher then the
setting
DIPU
.When
DeltaV
or
DeltaI
are active, the output signals PU_DV_A, PU_DV_B, PU_DV_C
and respectively PU_DI_A, PU_DI_B, PU_DI_C, based on a sudden change of voltage or current
detection, are activated with a 20 ms time off delay. The common pickup output signals PU_DV or
PU_DI are activated with a 60 ms time off delay, if any sudden change of voltage or current is
detected.
The delta function (except the sudden change of voltage and current detection) is
deactivated by setting the parameter
OpDVDI
to
Disabled
.
Section 13 1MRK 502 066-UUS B
Secondary system supervision
736
Technical manual

Table of Contents

Other manuals for ABB Relion 670 series

Related product manuals