EasyManua.ls Logo

ABB RER615 - Page 501

ABB RER615
869 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 250: Description of the equivalent load distance
The exact value for
Equivalent load Dis
can be calculated based on the load flow and
voltage drop calculations using data from DMS-system and the following equation.
Equivalent load Dis
U
U
d real
d tap d
=
=
( )
( , )1
(Equation 50)
U
d(real)
The actual maximum voltage drop of the feeder
U
d(tap,d=1)
The fictional voltage drop, if the entire load would be tapped at the end (d=1)
of the feeder (not drawn in
Figure 250
). The calculation of this value requires
data from the DMS system.
Alternatively, the setting
Equivalent load Dis
can be determined by conducting a
single-phase earth-fault test (R
fault
= 0 Ω) at that point of the feeder where the
maximum actual voltage drop takes place. This point is typically located at the end
1MRS758755 C
Protection related functions
REC615 & RER615
Technical Manual
501

Table of Contents

Other manuals for ABB RER615

Related product manuals