EasyManua.ls Logo

ABB SACE Emax E4.2 - Disassembly Operations for Circuit Breakers E1.2

ABB SACE Emax E4.2
311 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ABB | SACE Emax 2
Accessories | 1 - Preliminary considerations167 | © 2017 ABB | 1SDH001330R0002 - ECN000058721 Rev. A
Disassembly operations for
circuit breakers E1.2
To dismantle the accessories, the following parts must be removed from the circuit-breaker:
Front cover (A) and protection (F) by removing the screws (B and C).
For 4-p circuit-breakers, the lateral protection (D) by fixing the screws (C and E).
A
D
C
E
B
F
Figure 30 - Removing the front cover and protections
After reassembling the accessories, the parts previously dismantled must be reassembled as indicated:
Front cover (A) and protection (F) by screwing the fixing screws (B and C) with tightening torque 0.8 Nm
- 7 lb in (B) and 1.5 Nm - 13 lb in (C).
For 4-p circuit-breakers, the lateral protection (D) by fixing the screws (C and E) with tightening torque
1.5 Nm - 13 lb in.
A
D
B
C
E
F
Figure 31 - Assembly of front cover and protections

Table of Contents

Other manuals for ABB SACE Emax E4.2

Related product manuals