ABB | SACE Emax 2
Mechanical accessories | 7 - Installation285 | © 2017 ABB | 1SDH001330R0002 - ECN000058721 Rev. A
Positioning anchor plates E1.2
The following diagram shows the distance for positioning the first anchor plate for E1.2 circuit-breakers
according to the peak current:
100/
3.94
150/
5.91
200/
7.87
250/
9.84
300/
11.81
350/
13.78
400/
15.75
450/
17.72
19.69
40 60 80 100 120 140 160
E1.2
Figure 92
(1): distance of the first anchor plate from the circuit-breaker terminals
(2): peak current
Positioning anchor plates E2.2-
E4.2-E6.2
The following diagram shows the distance for positioning the first anchor plate for E2.2-E4.2-E6.2 circuit-
breakers according to the peak current:
100/
3.94
150/
5.91
200/
7.87
250/
9.84
300/
11.81
350/
13.78
400/
15.75
450/
17.72
500/
19.69
40 60 80 100 120 140 160 180 200 220 240 260 280 30
Figure 93
(1): distance of the first anchor plate from the circuit-breaker terminals
(2): peak current