1Getting Started
18 U2000 Series Operating and Service Guide
Configuring Your Power Sensor via Power Analysis Manager
1 Go to Start > All Programs > Agilent N1918A Power Analysis Manager > Advance
> Power Analyzer to launch your Power Analysis Manager.
2 With your power sensor still connected, a pop- up reminder dialog will
appear when you launch the Power Analysis Manager. The reminder
message will appear under two conditions:
a You have not set any calibration due date for your U2000 Series. The
reminder prompts you to set your calibration due date.
b Your calibration date is due and the reminder prompts you to send
your U2000 Series for calibration.
3 Click OK and you may proceed to set the calibration due date or
connect a new power sensor to proceed.
4 To set the calibration due date, go to Instrument Panel, in the System
tab, input the due date of your calibration in the Cal Due Date
property.
NOTE
For remote interface configurations of P-Series power meters, refer to Remote
Interface Configurations in Agilent P-Series Power Meters Installation Guide
and for remote interface configuration of N8262A P-Series modular power
meters, refer to N8262A P-Series Modular Power Meters Installation Guide.

Table of Contents

Other manuals for Agilent Technologies U2000 Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies U2000 Series and is the answer not in the manual?

Agilent Technologies U2000 Series Specifications

General IconGeneral
BrandAgilent Technologies
ModelU2000 Series
CategoryAccessories
LanguageEnglish

Related product manuals