EasyManua.ls Logo

Alcatel-Lucent 7750 SR-a8 - Page 106

Alcatel-Lucent 7750 SR-a8
232 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing, Wiring, and Connecting a –48 VDC PSU
106 7750 SR-a4 and SR-a8 Installation Guide
iv. Replace and tighten the terminal screw using a Phillips torque screwdriver. Do
not over-tighten. The recommended torque is 3 lbf-in (0.339 N
.
m).
v. Replace the safety cover that you removed from the terminal block in Step 3.
vi. Prepare the wire at the disconnect device according to local safety practices.
vii. Attach the wire to the disconnect device.
Step 7. Check that the DC supply wiring is correct.
Step 8. For redundant supply configurations, repeat Step 2 to Step 7 for the other PSUs.
Step 9. Install the other components in the chassis (as described in Installing PSUs on page
91), before you power up the system (as described in Powering Up, Initializing, and
Configuring on page 123).

Table of Contents

Related product manuals