User Manual
Product information and planning
9500 MPR Rel. 3.1
3DB18809AAAA Issue 1 67/980
2.1.10.3.3 Two cables (Core-E unit to MPT-HC V2)
Two cables connect the MPT:
– one optical cable connected to port#5 or port #6 of the Core-E unit or port #6 of the Core-E unit or
one electrical cable connected to the electrical ports (port#1 to port#4) of the Core-E unit.
– a coaxial cable connected to the station battery to provide the power supply.
Figure 26. MSS to MPT-HC V2 interconnection
Note: MPT-HC V2 must be connected to a fuse or a breaker on a customer power distribution box.
The recommended value is 3 Amps.
For the connection to the station battery refer to paragraph 2.1.10.4 on page 70.