45
5 Installation and first start 5.3 Operation
• Check that the bowl is tightly closed – no
water in the cyclone outlet.
• Disconnect the pipes for cooling water to the
outlet seals. Check for possible leakage from
these. Major leaks must not occur. Minor
leaks may temporarily be left uncorrected.
Some seals need as a rule certain wear-in
period.
• Connect the pipes for cooling water.
• Open the cooling water supply again.
5.4.1 Ejection process
• Disconnect the pipe from the cyclone as well
as the sediment cover flushing hose.
• Make the settings of the Operating Water
Module to achieve the discharge volumes
desired, see “Interface description,
Component description and signal
processing” in
Installation Manual
.
• Initiate a large discharge. If the bowl opens,
closes and then opens again (so-called
double discharge), adjust the air pressure
until you arrive at the volume desired. Finally
adjust the needle valve to achieve a suitable
small discharge.
• Secure the cyclone outlet pipe and the
sediment cover flushing pipe.
5.4.2 Cleaning
• Carry out the cleaning programme. Check
that washing solution is running out of the
axial seals.
WARNING
Liquid ejected at high
velocity
Ensure that no sediment discharge takes
place when opening cyclone cover. Wear
safety goggles.
S0118311