EasyManua.ls Logo

Allied Telesis AT-GS948MX - Installing the Switch in an Equipment Rack

Allied Telesis AT-GS948MX
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AT-GS900MX Series Installation Guide for VCStack
71
Installing the Switch in an Equipment Rack
This procedure requires the following items:
Eight bracket screws (included with the switch)
Two equipment rack brackets (included with the switch)
Flat-head screwdriver (not provided)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
Installation guidelines may be found in “Selecting a Site for the Stack” on
page 62. Here is the procedure for installing the switch in a 19-inch
equipment rack.
Caution
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack. E28
1. Place the unit upside down on a level, secure surface. See Figure 23.
Figure 23. Turning the Switch Upside Down
2. Using a flat-head screwdriver, pry the rubber feet from the bottom of
the switch. See Figure 24.
Figure 24. Removing the Rubber Feet

Table of Contents

Related product manuals