Chapter 4: Installing the Switch on a Table or in an Equipment Rack
72
3. Turn the switch over.
4. Attach the two rack mount brackets to the sides of the switch with the
eight bracket screws that come with the unit.
The AT-GS924MX Switch comes with one short bracket and one long
bracket. Allied Telesis recommends installing the short bracket on the
right side and the long bracket on the left side, as you face the front of
the unit, so that the stacking ports on the unit align with the same ports
on other AT-GS900MX Series switches in the equipment rack. The
possible positions of the brackets are shown in Figure 25.
Figure 25. Installing Brackets on the AT-GS924MX Switch
The bracket positions for the AT-GS924MPX, AT-GS948MX, and
AT-GS948MPX Switches are shown in Figure 26 on page 73 and
Figure 27 on page 74.