EasyManua.ls Logo

Allied Telesis AT-GS948MX - Figure 40: Removing the Dust Plug from the S2 Slot

Allied Telesis AT-GS948MX
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
AT-GS900MX Series Installation Guide for VCStack
85
5. Remove the dust cover from the S2 slot in the next switch in the stack
as shown in Figure 40.
Note
The cable must cross over to different slots on the switches. The
stack will not work if you connect two S1 or S2 slots together.
Figure 40. Removing the Dust Plug from the S2 Slot
6. Remove the dust cover from the connector on the other end of the
transceiver.
7. Position the transceiver with the release tab on the bottom and slide it
into the slot until it clicks into place, as shown in Figure 41 on page 86.

Table of Contents

Related product manuals